THE PRO VERSION OF SCOPE READY · FOR LIVE BIDS & INSTALLS

Catch costly scope gaps in RFQs and draft airtight change orders.

Upload a real customer RFQ, SOW or site-delay email. ScopeShield flags missing specs and commercial traps with the exact clause quoted, then drafts your clarification or change order and checks it against BAR-D before you hit send.

Every quote checked against your documentYour documents are never storedNo credit card for the trial
scopeshield.pjcroft.com/workspace
LaserCell_RFQ.pdfColumbus, OH · 3 sections
Checking 20-point checklist
  • Site & utilities
  • Logistics & rigging
  • Schedule & labor
  • Acceptance & commercial
  • Citation check
Scope-Gap & Risk TableOVERALL RISK · HIGH
Practice → Live

You rehearsed the conversation. Now win it on the real job.

Scope Ready trains you on 30 simulated scope fights. ScopeShield runs the same scope standard on the documents in your inbox.

Scope Ready · Training

Learn to defend scope

Voice-first practice against AI site managers and procurement leads.

  • 30 canned scenarios
  • Graded on BAR-D
  • Built for building the habit

Practice at scopeready.pjcroft.com →

The Scope Ready robot in safety glasses, waving
ScopeShield · Pro

Defend it on live documents

Your RFQs, SOWs and customer emails, audited and answered with the same standard.

  • Scope-gap audit with verbatim clause citations
  • Clarification and change-order drafts, BAR-D checked before you send
  • One-page PDF memo ready to attach to a quote
What hides in an RFQ

The expensive clauses never look expensive.

Three lines from one short laser-cell RFQ. Each one quietly moves cost, risk or schedule onto the vendor.

HIGH · §2.4

Uncapped penalties

Any delay beyond Day 14 shall incur liquidated damages of $2,500 per day with no cap.

Day 15 onward is open-ended, including delays the customer’s own site causes.

Flag: cap and carve out customer-caused delay
HIGH · §3.1

A warranty that may never start

Warranty begins only after Customer signs Final Commercial Acceptance following 30 days of continuous 3-shift production.

If the customer never runs three shifts, the warranty clock never starts.

Flag: start at acceptance or a fixed date, whichever is earlier
HIGH · §1.0

Rigging you didn’t price

Vendor shall deliver, offload, rig into position, and commission

Cranes, riggers and offload liability land on you — and none of it was quoted.

Flag: price it, or move it to the customer’s rigger
How it works

From customer document to defensible reply.

No templates to fill in. Drop the document, review what it found, send something you can stand behind.

1

Drop in the document

A customer RFQ, a draft SOW, or paste the site-delay email. Text is extracted in memory and never stored.

PDFDOCXTXTPasted email
2

Get the scope-gap audit

Checked against the 20-point Industrial Scope Checklist. Every flag carries a severity, the section reference and the exact quote — or “Omitted from document”.

3

Draft the reply, pre-flighted

A clarification email or change-order notice anchored to the cited sections, scored on BAR-D and scanned for hedging before you see it. Edit it and the X-Ray re-scores.

4

Export the 1-page memo

A clean Scope Clarifications & Exclusions memo or Change Order Notice PDF to attach to the quote or send to the customer PM.

Sample audit

One RFQ, start to finish.

A sample 6 kW fiber-laser-cell RFQ, the gap table ScopeShield builds from it, and the clarification email it drafts.

Customer RFQ — Automated 6 kW Fiber Laser Cell, Columbus, OHSample document · 3 sections
Section 1.0 Scope of Supply
Vendor shall deliver, offload, rig into position, and commission one automated 6kW fiber laser cutting cell on a turnkey basis at Customer's Columbus, Ohio plant.
Section 2.4 Schedule and Penalties
Final acceptance must be completed within 14 calendar days of truck arrival. Any delay beyond Day 14 shall incur liquidated damages of $2,500 per day with no cap.
Section 3.1 Acceptance
Warranty begins only after Customer signs Final Commercial Acceptance following 30 days of continuous 3-shift production.
High-severity clauseMedium-severity clausePlus 5 requirements the RFQ never mentions
OVERALL RISK · HIGHThe RFQ makes the vendor carry offloading and rigging, uncapped daily penalties from Day 15, and a warranty that only starts after 30 days of 3-shift production. Power, air, acceptance metrics and test material are not defined.
SeverityRiskClauseQuoted textRecommended exclusion
To: Customer purchasing & project leadSubject: RFQ 6 kW Laser Cell — scope clarifications before quote
Hi Dave, Before we finalize our quote, three items in the RFQ need to be clarified. Section 1.0 has us offloading and rigging the cell, Section 2.4 sets liquidated damages of $2,500 per day with no cap, and Section 3.1 starts warranty only after 30 days of continuous 3-shift production. Our quote covers delivery to your dock, mechanical placement supervision, and commissioning. Offloading and rigging will be by your rigging contractor, and the 480V/3-phase drop and compressed air at the cell are yours to provide before we arrive. As written, a site-readiness delay on your side could cost us $2,500 every day with no limit, and the warranty may never start. We propose liquidated damages capped at 5% of the contract value, excluding delays caused by site readiness, and warranty starting at Final Acceptance or 30 days after commissioning, whichever is earlier. Please confirm these clarifications by Friday at 12:00 so we can release the quote with them included. If we don't hear back, the quote will list them as stated exclusions. Best regards, Paul
Editable in the workspace · re-scores as you type

BAR-D Pre-Flight

–
Ready to send
Baseline Anchor§1.0, §2.4, §3.1 cited
Responsibility SplitRigging, power, air → customer
Impact & Trade-Offs$2,500/day exposure named
Decision GateFriday 12:00 deadline
  • 0 hedging phrases
  • 3 of 3 high-severity gaps addressed
  • Every cited clause verified

Sample document and sample output for illustration. In the workspace, ScopeShield audits your own documents.

The 20-point Industrial Scope Checklist

Built by people who’ve stood on the plant floor waiting for power.

Every document is checked against the scope traps that cost capital-equipment builders and integrators real money.

Pre-flight before you send

Every draft is graded on BAR-D before you see it.

The same four-pillar standard Scope Ready trains — now a quality gate on the email that actually goes to your customer.

B

Baseline Anchor

Ties every point to the section and wording of the customer’s own document.

“Section 2.4 sets liquidated damages of $2,500 per day with no cap.”
R

Responsibility Split

Says plainly what you cover and what the customer owns.

“Offloading and rigging will be by your rigging contractor.”
I

Impact & Trade-Offs

Puts days, dollars and options on the table instead of complaints.

“Capped at 5% of the contract value, excluding site-readiness delays.”
D

Decision Gate

Ends with a firm decision and a deadline, not “let us know”.

“Please confirm by Friday at 12:00 so we can release the quote.”

Hedge detector

Catches the phrases that hand margin back before the customer even asks.

sorry to bothermaybe we can absorbwhenever you get a chancejust

Coverage check

Confirms every high-severity gap from the audit is actually addressed in the draft.

Uncapped liquidated damages · §2.4COVERED
Warranty start trigger · §3.1COVERED
Offloading & rigging liability · §1.0COVERED
Pricing

One caught clause can pay for the year.

Monthly plans for working PMs and teams. Start with two free audits on your own documents.

Free Trial

Try it on a live bid
$0
  • 2 live document audits
  • Scope-gap table with clause citations
  • BAR-D pre-flighted drafts
  • Watermarked PDF export
Start Free

Solo PM

For one estimator or project manager
$99 / month
  • 25 document audits a month
  • Unlimited BAR-D draft rewrites
  • Clean, unwatermarked PDF exports
  • Optional company header on PDFs
Choose Solo PM
FOR OEMS & INTEGRATORS

Team / OEM

For estimating and project teams
$249 / month
  • 100 document audits a month
  • Up to 5 seats
  • Custom Company Standard Exclusions Profiles
  • Everything in Solo PM
Choose Team / OEM

One account across the pjcroft.com family — the same sign-in as Scope Ready.

Questions

Good to know

No. ScopeShield is commercial scope analysis only — not legal advice. It flags operational, technical and commercial scope gaps and drafts business correspondence. Have contract terms reviewed by your own counsel.

They are never stored. Text is extracted in memory for the audit and any temporary file is deleted immediately. ScopeShield keeps only usage counts and your company profile settings. Details are in the privacy notice.

Every quoted clause is checked word-for-word against your document’s text before you see it. Anything that doesn’t match is marked unverified instead of passing silently, and requirements the document leaves out are labelled “Omitted from document”.

Customer RFQs, draft SOWs and contract excerpts as PDF, DOCX or TXT, or paste a customer email or field note straight into the workspace.

No. Scope Ready is the practice simulator; ScopeShield works on your live documents. They share one pjcroft.com account, and the same BAR-D standard runs through both.

On Team / OEM, you save your company’s standard exclusions and clarifications so every audit and draft uses your house wording instead of generic text.

Run your next RFQ through ScopeShield before you quote it.

Two free audits on your own documents. See what the customer’s paperwork is really asking you to carry.

Start Free — 2 Audits No credit card for the trial · Documents never stored · Commercial scope analysis only, not legal advice